| Camera | Top camera: a shoe (0.1 m) on the arc 30° off centre at 8.15 m | 33.7 px | ≥ 20 px | passes |
| Camera | Top camera: smear at 11 km/h, 2 ms exposure | 6 mm | ≤ 1/3 of the shoe (33 mm) | passes |
| Camera | Top camera: frame rate the calls need | 30 fps at 3840 × 2160 | chip: 30 fps at 3840 × 2160 | passes |
| Camera | Top camera: data rate vs its 4-lane link | 2.49 Gbps (10-bit) | ≤ 80 % of 3.564 Gbps | passes |
| Camera | Right corner camera: a shoe (0.1 m) at the wing, 45° on the arc at 7.39 m | 33.5 px | ≥ 20 px | passes |
| Camera | Right corner camera: smear at 7 km/h, 4 ms exposure | 8 mm | ≤ 1/3 of the shoe (33 mm) | passes |
| Camera | Right corner camera: frame rate the calls need | 10 fps at 2592 × 800 | chip: 15 fps at 2592 × 1944, 30 fps at 1920 × 1080, 60 fps at 1280 × 720 | passes |
| Camera | Right corner camera: data rate vs its 1-lane link | 0.17 Gbps (8-bit) | ≤ 80 % of 0.384 Gbps | passes |
| Camera | Left corner camera: a shoe (0.1 m) at the wing, 45° on the arc at 7.39 m | 33.5 px | ≥ 20 px | passes |
| Camera | Left corner camera: smear at 7 km/h, 4 ms exposure | 8 mm | ≤ 1/3 of the shoe (33 mm) | passes |
| Camera | Left corner camera: frame rate the calls need | 10 fps at 2592 × 800 | chip: 15 fps at 2592 × 1944, 30 fps at 1920 × 1080, 60 fps at 1280 × 720 | passes |
| Camera | Left corner camera: data rate vs its 1-lane link | 0.17 Gbps (8-bit) | ≤ 80 % of 0.384 Gbps | passes |
| Camera | Image processor load, all cameras | 290 Mpx/s | ≤ 360 Mpx/s (RV1126B ISP) | passes |
| Camera | Cameras in step for timed calls | the corner boards timestamp each frame on a frame-sync pair from the main board, through the corner lead | the corner frames and the top camera on one clock | passes |
| Camera | AI engine time per frame | 3 TOPS for the top camera and the corner frames | ball and ring model at 30 fps on a crop round the ring; person and foot model at 10 fps on the arc and on the corner frames | to prove on the dev kit |
| Power | Supply | the gym's shot-clock mains feed into a push-in terminal on the power board in the clock box, a PCB-mount Mean Well IRM-60-5 (5 V 10 A, 50 W) | ≤ 70 % of the supply (35 W) | passes |
| Power | Power cut | no cells: a power cut stops the board; every call is written to eMMC as it happens and signed | no lost call in a power cut | to prove on the dev kit |
| Heat | RV1126B temperature, a full gym in summer, 32 °C at the top of the backboard | 45 °C | ≤ 85 °C (rated) | passes |
| Heat | Top camera chip away from the processor | 45 mm from the RV1126B | ≥ 30 mm | passes |
| Heat | Mains supply in the closed clock box | IRM-60-5 at about 12 W in play (24 % load) and 35 W for 3 s at a period end | inside the module's rating at 50 °C in the box, no derating | to prove on the dev kit |
| Shock | Shock and vibration | 200 g (est.) | standard parts | passes |
| Software | Starts our software from the microSD card, no setup | microSD socket with a hinged, latched lid (Amphenol 101-00660 class), fitted on every board: our software starts from the card; microSD socket with a hinged, latched lid (Amphenol 101-00660 class): the ESP32-S3 loads our program from the card; microSD socket with a hinged, latched lid (Amphenol 101-00660 class): the ESP32-S3 loads our program from the card | card socket fitted on every board, latched | passes |
| Software | Card power switch and protection | 3 power switches and 3 ESD arrays for 3 card sockets | every socket: switched card supply, ESD on all 6 lines | fixed by the review |
| Software | The card wins the start | eMMC shipped empty; our loader reads the card first | the processor starts from the card every time | fixed by the review |
| Software | Card grade | industrial pSLC microSD (Kingston Industrial or Swissbit S-56u), −40 to 85 °C | rated for the heat, cold and writes | to prove on the dev kit |
| Software | Clip buffer for an unsure call | 3.3 s of 8-bit 30 fps video in 40 % of the 2 GB memory | ≥ 3 s | passes |
| Radio | Wi-Fi/BT module clock | 37.4 MHz MEMS oscillator (Y2) | 37.4 MHz next to the AP6256 | passes |
| Radio | Wi-Fi and BT from inside the aluminium frame | AP6256 module, its chip antenna at the main board's back edge, 2 mm behind the Ø20 radio window in the top rail's back face | certified module; the scorer's tablet at the side of the court and the other backboard 26 m away | to prove on the dev kit |
| Moisture | Conformal coating | coated | coated, sensors, sockets and antennas masked | passes |
| Fit | Board inside the product CAD, every part checked in 3D | not yet in the product CAD | nothing touches | to prove on the dev kit |
| Camera | Every call in a camera's view, from where each lens sits | top camera worst 25.8° across, 22.7° up-down; corner cameras worst 20.2° / 4.5° | inside 80 × 50.6° and 60 × 46.8° | passes |
| Camera | Top camera window (lesson: window) | the ball through the net is 77° from the front face with the 3° margin; the view uses -6.7 to 6.7 across and -28.3 to 8.2 mm up-down of the window centre | the rev T window, 18 × 39 mm, inside the top rail's front face | fixed by the review |
| Camera | Corner camera windows (lesson: window) | in each side rail's outer face, 24 × 22 mm; steepest line of sight 61° from the face; margin 0.3 mm | every corner call through the window, ≤ 70° from the face | fixed by the review |
| Fit | Camera heads in 3D | top head 0.3 mm behind the wall, barrel 5.7 mm, hinge 29.2 mm; corner heads 0.3 mm, barrel 6 mm, hinge 26 mm | holders ≥ 0.3 mm off the wall, heads inside the rail, hinges within their flex | to prove on the dev kit |
| Camera | Corner frames over the wire | 4 frames of a 2592 × 800 JPEG crop round each shot release, about 0.5 MB, about 1 s at 4 Mbps | the three-point call before the ball reaches the ring (about 1 s) | to prove on the dev kit |
| Light | Call lights round the frame | 29 light sections of 14 RGB LEDs (406 per backboard) over the 12 mm slots: red all round, yellow along the top | FIBA 1.1.6 and 1.1.7: red at the end of a period, yellow at the shot clock signal, seen from the court; RGB call colours only in club play | to prove on the dev kit |
| Light | Shot clock digits | two digit boards, 2 digits of 130 mm and a point in 100 red LEDs each, 4 mm behind the windows | FIBA 5.6: seen from the court and the scorer's table; seconds and tenths under 5 s | to prove on the dev kit |
| Power | Mains on the power board | push-in 3-pole terminal, 2 A slow-blow fuse and varistor, PCB-mount IRM-60-5 (Class II), 2 mm milled slot and 6 mm keep-out between the mains and 5 V sides; the feed in through a gland in the box floor (rev T) | creepage and clearance per IEC 62368-1 (est. 6 mm reinforced at 250 V); the gym's electrician wires the shot-clock feed | to prove on the dev kit |
| Fit | Leads along the frame | clock box to the main board, 5 V: 0.6 m of 18 AWG, 0.08 V drop at 6.5 A; main board to each corner board: 1.16 m of 24 AWG, 0.07 V drop at 0.35 A; main board to the rim board: 2.05 m of 24 AWG, 0.05 V drop at 0.15 A; main board to the farthest light chain (bottom), 5 V and data: 1 m of 22 AWG, 0.1 V drop at 0.9 A | clock lead ≤ 0.15 V; corner and rim ≤ 0.25 V; light chains ≤ 0.3 V | passes |
| Security | Service cover tamper sensor | DRV5032 Hall switch on the main board, a Ø10 × 5 magnet on a printed boss under the service cover 13 mm away (about 22 mT, est.) | cover opened = logged and signed | to prove on the dev kit |